Secant Piles
& Contiguous piles
Secant piles are a construction technique used to create a continuous wall by drilling a series of overlapping concrete piles. This method is particularly effective for providing rigid lateral support and controlling groundwater.
A guide wall is built at the top to ensure the alignment of the piles. Unreinforced primary piles are drilled first. Reinforced secondary piles are drilled between the primary piles, overlapping them to form a continuous barrier.Contiguous piles are also a shoring technique, however the supporting piles are closely spaced with minimal gaps between them to form a continuous barrier. This is used in areas where water is not significant or the water pressure is very minimal. This is usually proposed in clay soils and can use to retain dry granular material or fills.
Secant piles and contiguous piles are usually used for earth retention, water control if secant piles, slope stabilization and tunneling projects.
A guide wall is built at the top to ensure the alignment of the piles. Unreinforced primary piles are drilled first. Reinforced secondary piles are drilled between the primary piles, overlapping them to form a continuous barrier.Contiguous piles are also a shoring technique, however the supporting piles are closely spaced with minimal gaps between them to form a continuous barrier. This is used in areas where water is not significant or the water pressure is very minimal. This is usually proposed in clay soils and can use to retain dry granular material or fills.
Secant piles and contiguous piles are usually used for earth retention, water control if secant piles, slope stabilization and tunneling projects.









